Belchamp Community House Retrofit Case Study
SWIP Case Study | Community Retrofit
Belchamp Community House
A fabric-first retrofit helping a much-loved community landmark become warmer, more efficient and ready for its next chapter.
Location
Belchamp St Paul, Essex
Building
Community House
Improvements
Internal Wall Insulation and Underfloor Insulation
Delivery Partners
SWIP, CT Eco Plus and Faith Eco Solutions
About the Client
At the heart of the community
Belchamp Community House is a listed community centre at the heart of Belchamp St Paul. Owned and managed by a dedicated group of trustees, the building provides an important meeting place for the village and hosts a wide variety of activities, events and community groups throughout the year.
Improving its energy efficiency required a sensitive and carefully planned approach. The character of the historic building needed to be protected, while the community centre also had to remain operational throughout the work. This meant finding an insulation solution that could be delivered in manageable phases with minimal disruption to the people who rely on the building.
The Challenge
Reducing heat loss while keeping the doors open
Rising energy costs and ongoing heat loss were making Belchamp Community House increasingly difficult and expensive to keep warm. As a well-used community building, improving its thermal performance was important both for the comfort of its users and its long-term future.
The work also needed to respect the character of the listed building and, crucially, the centre had to remain operational throughout the project. The team therefore needed an approach that could improve the walls and floors while allowing the installation to progress in carefully managed phases, minimising disruption to the community.
The Solution
A fabric-first approach, delivered in phases
The project team adopted a fabric-first approach, using internal wall insulation and underfloor insulation to improve the building’s thermal envelope and help reduce heat loss through two key areas of its construction.
Rather than treating the community centre as a straightforward modern property, the installation was planned around the existing building and its continued use. Work was divided into manageable phases, allowing individual areas to be completed while limiting disruption to the centre’s activities.
SWIP worked alongside CT Eco Plus and Faith Eco Solutions, providing the insulation system and technical support required to help the delivery team address details as the project progressed.
Project Delivery
01
The building and its existing construction were assessed in July 2025 to identify where thermal improvements could be made.
02
The project team and trustees developed an approach suited to the building, its character and its continued community use.
03
Internal wall and underfloor insulation were delivered in manageable phases to limit disruption to activities.
04
The fabric improvements created a stronger foundation for the building’s planned heating and window upgrades.
Preparing the structure
The framework was formed around the existing construction, ready to receive the insulation.
Installing the insulation
Insulation was carefully fitted between the timber members to create a continuous thermal layer.
Careful detailing
Close attention was given to fitting and junctions as the installation progressed around the building.
The Results
A warmer, more energy-efficient building fabric
Independent technical assessment and post-completion thermal imaging confirmed a substantial improvement in the performance of the building’s walls and floors.
01
86%
Wall U-value improvement
Improved from 2.20 to 0.30 W/m²K.
02
79%
Floor U-value improvement
Improved from 0.70 to 0.15 W/m²K.
03
9,750
kWh/year reduction
Estimated reduction in annual space-heating heat loss.
04
Full compliance
No critical defects
Confirmed through the final technical inspection.
Subfloor and ventilation optimisation: The final inspection required only minor commissioning adjustments to the subfloor ventilation to help ensure suitable fabric airflow and moisture control.
Thermal Assessment
Performance verified after installation
Post-completion FLIR thermal imaging found that the thermal bridging and heat-loss variations identified during the pre-installation surveys had been eliminated. Each thermal image below is shown with its corresponding visible-light view.
External fabric assessment
Post-completion thermal image with the corresponding visible-light view of the building exterior.
Internal fabric assessment
Post-completion thermal image with the corresponding visible-light view of the internal corridor.
“
Client Testimonial
“Working with SWIP and CT Eco Plus has been a seamless and rewarding experience. Their expertise and support have been invaluable in helping us future-proof our beloved community house.”
Clive Waite
Trustee, Belchamp Community House
Ready to take the next step?
Planning a similar retrofit project?
Whether you’re improving a community building, upgrading traditional housing or planning a wider retrofit programme, the SWIP team can help you identify the right insulation system and support successful delivery.
Contact the SWIP team
Or email us at marketing@swipiwi.co.uk